“Extruder” industrial production hall cooling engineering execution designation

PROJECT DESCRIPTION

The aim of the execution was to replace the significantly deteriorated chillers that provided comfort cooling for the existing (extruder production hall and office spaces) and cooling for manufacturing technology with more economical and reliable equipment.

The execution was completed in two phases:

In the first phase, a 1.5 MW chiller was installed along with the associated heating center.

In the second phase, we installed an 850 kW chiller, which ensured redundancy for the 1.5 MW chiller installed in the first phase. Additionally, the existing cooling system became expandable and even more economical to operate.

PROJECT DETAILS

Client
MONDI Szada Kft.
Location
Magyarország, Szada
Area
1,300 m2