Complete mechanical execution designation of printing industry hall building

PROJECT DESCRIPTION

**Project Details in More Depth (Instead of Challenges):**

The developer intended to construct a „printing industry hall” of approximately 1000 m². Within the hall, offices, a server room, and a social block were also created. The task involved expanding the existing water supply and heating system for the office areas, as well as installing a new heat recovery ventilation system and a VRV heat pump air conditioning system.

To ensure comfort in the „production hall,” we installed a centrally located outdoor ventilation unit with a capacity of 60,000 m³/h, equipped with heat recovery. The heating was managed through the installation of an integrated gas burner module in the ventilation unit. For cooling, a chiller with a cooling capacity of 175 kW was connected to the ventilation unit. Additionally, we established an exhaust system independent of the comfort air handling system to serve the manufacturing technology.

PROJECT DETAILS

Client
TWL Kft.
Location
Dunakeszi, Pallag utca
Area
1000 m2

PROJECT IMAGES

Looking for quality execution?

Request a quote NOW!